Session Checklist

Use this checklist every time you start a drtwrk session to confirm everything is set up correctly before grading.

Before you start​

  • Civil 3D 2023, 2024, 2025, 2026, or 2027 is installed
  • drtwrk is installed and the DRTWRK Tools tab is visible in the ribbon
  • Auto-save is enabled
  • Your DWG file is open and saved

2D Processing​

  • Lot lines are present and correct in the drawing
  • Property line is in 2D and has elevations assigned (if applicable — project to road surface if needed)
  • All layers are mapped correctly in the 2D Checks wizard
  • 2D processing completed with zero remaining issues

3D Processing​

  • Road surface is identified and confirmed in Stage 1 of the wizard
  • Construction boundary is set
  • 3D processing completed with zero remaining issues

Presets​

  • At least one lot preset created for each lot type in the file
  • At least one zone preset created (if the file has zones)
  • All preset values reviewed and confirmed

Grading​

  • Subdivision is rendering correctly on screen
  • Every lot has a preset assigned
  • Every zone has a preset assigned (if applicable)
  • Every area has full preset coverage (all lots and zones assigned)
  • Grading submitted and results are visible
  • Results reviewed using the review checklist
  • Any issues noted and reported to the drtwrk team

Export​

  • Label settings configured
  • Export to CAD complete
  • Results reviewed inside Civil 3D