Session Checklist
Use this checklist every time you start a drtwrk session to confirm everything is set up correctly before grading.
Before you start
- Civil 3D 2023, 2024, 2025, 2026, or 2027 is installed
- drtwrk is installed and the DRTWRK Tools tab is visible in the ribbon
- Auto-save is enabled
- Your DWG file is open and saved
2D Processing
- Lot lines are present and correct in the drawing
- Property line is in 2D and has elevations assigned (if applicable — project to road surface if needed)
- All layers are mapped correctly in the 2D Checks wizard
- 2D processing completed with zero remaining issues
3D Processing
- Road surface is identified and confirmed in Stage 1 of the wizard
- Construction boundary is set
- 3D processing completed with zero remaining issues
Presets
- At least one lot preset created for each lot type in the file
- At least one zone preset created (if the file has zones)
- All preset values reviewed and confirmed
Grading
- Subdivision is rendering correctly on screen
- Every lot has a preset assigned
- Every zone has a preset assigned (if applicable)
- Every area has full preset coverage (all lots and zones assigned)
- Grading submitted and results are visible
- Results reviewed using the review checklist
- Any issues noted and reported to the drtwrk team
Export
- Label settings configured
- Export to CAD complete
- Results reviewed inside Civil 3D